Products


Construction of flanges
Construction of flanges

Horse, beef, sheep pads supplies and on-site construction work!
.
- crane construction, installation of acacia columns with tractor mounted pile driver, youtube video
.
- pile of youtube videos
.
We build larger pens with a pile-driving machine, construction of smaller pens with pit drilling. After pit drilling, the columns are fixed by tipping the ground around them. In the first period after the construction of the bracket, the columns are not yet fully fixed. The final fixation is provided by the soil that is compacted by the rain.
.


Write review
Name
E-mail
Message
Rate

Reviews of the product
Be the first to review this product!